St. John’s snow removal scheduled for Monday night
The City of St. John’s is advising motorists that snow removal and street widening operations are scheduled from Monday, December 29 2025 at 11:00 pm until Tuesday, December 30 2025 at 6:00 am. During that time, vehicles must be removed to avoid being ticketed or towed from 11 downtown streets:
- Church Hill (Queen’s Rd to Veteran’s Sq)
- Convent Sq (Hamilton Ave to End)
- Garrison Hill (Military Rd to Queen’s)
- Gower St (Queen’s Rd to Church Hill)
- Hamilton Ave (Hamilton Ave Ext to Water St
- Hamilton Ave Exten (Blackmarsh Rd to Cornwall Ave)
- Long’s Hill (Queen’s Rd to Gower St)
- New Gower St (Duckworth St to Hamilton Ave)
- Prescott St (Military Rd to Water St)
- Queen’s Rd (King’s Rd to Duckworth St)
- Water St (Waldegrave St to Topsail Rd)
